Office Air Conditioning, Sized for Your Building
Offices are harder to size than most spaces, and the usual reason a system underperforms is that nobody accounted for what is actually in the building.
The load comes from more than the weather. People generate heat, and an open-plan floor at full occupancy generates a great deal of it. So do monitors, workstations, printers and comms cabinets. South-facing glazing shifts the picture again, and the picture changes hour by hour as the sun moves round the building.
That is why we survey rather than quote from a floor area. Occupancy, equipment load, glazing, orientation, ceiling height, and the hours the space is actually used all change the answer, and a system sized from square metres alone will be wrong in one direction or the other.
Office Air Conditioning Systems We Install
-
Ceiling cassette systems
The standard choice for open-plan floors and suspended ceilings, distributing air in four directions from a single unit.
-
Wall mounted units
Meeting rooms, individual offices, smaller suites.
-
Multi split systems
Several indoor units running from one outdoor unit, which keeps the external plant footprint down on constrained sites.
-
Ducted systems
Where the ceiling void allows and the units need to be out of sight entirely.
-
Larger multi-zone setups
Across floors, wings or multiple buildings.
-
Floor standing units
Period buildings and converted offices where wall and ceiling space is limited
We supply and install systems from Mitsubishi, Daikin, Hitachi and Fujitsu, and we maintain all makes and models regardless of who installed them.
Our Office Air Conditioning Installation Process
When you contact us about office air conditioning installation in Nottingham, we keep the process straightforward.
Need our expert help? Get it touch now.
Air Conditioning for all Office Types
Most office work falls into one of four shapes. Each one changes what we fit, how long we need, and how we plan the work around you.
Single rooms and small offices
Up to three or four rooms. One outdoor unit serving two or three indoor heads, wall mounted, with the external plant on a flat roof or rear elevation.
The free site survey takes about an hour. Most installs are done inside a day or two, and we can usually do them without you leaving the office. We will tell you if a smaller system does the job; oversizing an office costs more to run, not less.
Open-plan floors
Ceiling cassettes. We work from a floor plan with the desk layout on it, because cassette positions have to clear the occupied seats, that is what stops two people sitting in the draught while the far end stays warm.
Ceiling work is the disruptive part, so we do it out of hours as standard. The floor is sheeted before we start and ready to work in the next morning
Office suites with meeting rooms
Mixed rooms carrying very different loads. Meeting rooms and boardrooms get their own indoor unit and their own control, as an empty room and the same room with twelve people in it need completely different things.
We phase these room by room. You lose one room at a time rather than the suite, and we agree the order with you before we start.
Multi-floor buildings
VRF, or variable refrigerant flow. One outdoor plant serves a large number of indoor units across several floors, and it will heat one floor while cooling another, which matters when your south and north elevations behave nothing alike.
Riser routing and plant position get settled at survey, before anything is ordered. Installation is phased floor by floor so the building stays occupied throughout, and we will give you a programme showing which floor is affected in which week.
Zone Control for Offices
A meeting room with twelve people in it and an empty corner office do not want the same thing at the same time. Neither does a south-facing floor in the afternoon and a north-facing one in the morning.
Zoned systems let you control areas independently, by room, by floor or by wing, and schedule them around occupancy rather than running the whole building to one setpoint from eight until six.
Two consequences worth knowing. Running costs fall, because you are only conditioning the space in use. And the complaints stop, because the people who are always too cold and the people who are always too hot are no longer sharing a thermostat.
Office Air Conditioning That Heats and Cools
Every system we install runs in reverse, so the same plant that cools the floor in July heats it in February. For most office, this removes the need for a separate heating system entirely, and it means one asset, one maintenance contract and one F-Gas record rather than two of everything.
A unit that moves heat rather than generating it delivers four to five units of heat for every unit of electricity it draws. A direct electric heater delivers one.
More on commercial heating and cooling from one system
Maintenance Services and F-Gas Compliance
- Maintenance: Office systems run most of the year once they are heating as well as cooling, which changes the service case. Planned preventative maintenance covers scheduled visits, filter and coil cleaning, refrigerant and electrical checks, performance testing and F-Gas record keeping. Most office sites are visited twice a year.
- F-Gas: Systems containing fluorinated gases need leak checking at intervals set by charge size, with records kept. The legal duty sits with the operator of the equipment, not the contractor. We are REFCOM registered and we update your refrigerant records on the day we attend.
- TM44: Any building with air conditioning over 12kW effective rated output must be inspected every five years by an accredited energy assessor. Most offices with more than a couple of units are over that threshold. The inspection is a separate appointment from your maintenance contractor, but if your records are not current we will say so.
Office Ownership – Landlords and Tenants
Worth settling before anything is specified, because it decides who pays and what happens at the end of the lease.
Tenant
If you are a tenant, check whether the lease allows alterations, whether the landlord needs to approve the external unit position, and, the one that catches people out, whether you will be required to remove the system and make good at lease end.
Dilapidations clauses frequently cover exactly this.
Landlord
If you are a landlord, a system fitted to a common standard across a building is easier to maintain and more attractive to the next tenant than four different ones fitted by four different tenants.
We work with both, and we will put the position in writing so there is something to take to the other party.
Why Atkins Air Conditioning?
- REFCOM registered and City & Guilds qualified engineers, 18th Edition compliant
- CSCS and PASMA certified for site access and work at height
- all makes and models maintained, whoever installed them
- F-Gas records updated on the day of the visit
- installation, maintenance and repair from the same team
- evening and weekend working on occupied offices as standard
- free site survey with no obligation and no call-out charge on quotations
- based in Nottingham, covering the East Midlands
Recent Commercial Air Conditioning Projects
We work with businesses, education providers and other organisations to deliver commercial air conditioning installations that are planned around the way their premises operate.
Need our expert help? Get it touch now.
What our customers say.
Get your free quote today!
Trusted by our customers for over 20 years – you couldn’t be in safer hands. Contact us now to book your free consultation with an expert of our team.
Office Air Conditioning FAQs
It depends on when it is done. Core drilling and pipework are noisy and dusty, which is why we work evenings and weekends on occupied offices as standard. Access and hours are agreed before the quotation, not after.
It depends on occupancy and equipment load rather than floor area. A meeting room used by twelve people needs more than an open-plan area of the same size used by four. The survey works it out properly.
Yes, zoned systems let you control by room, floor or wing, and schedule around occupancy. In most offices that is the difference between a system people are happy with and a system people complain about.
Yes, every system we install runs in reverse, which for most offices removes the need for a separate heating system.
If the building’s air conditioning exceeds 12kW effective rated output, yes, every five years, by an accredited energy assessor. Most offices with more than a couple of units are over the threshold.
The operator of the equipment, not the contractor. We carry out and record the work and update the refrigerant records on the day. The obligation to hold them remains yours.
Yes, all makes and models. A large proportion of the office sites we maintain were fitted by someone else.
Usually, but check the lease first, particularly whether the landlord must approve the external unit position and whether you will have to remove the system at lease end.
There is no single legal figure. HSE guidance says indoor workplace temperature should normally be at least 16°C, or 13°C where the work involves rigorous physical effort. Most offices are comfortable between 21°C and 23°C, but that is guidance on comfort rather than law.
There is no legal maximum and no fixed point at which it is officially too hot to work. The employer’s duty is to keep the temperature at a comfortable level and provide clean, fresh air, which is why a floor that overheats every summer is a compliance conversation as well as a staff one
Book your appointment now.
Trusted by our customers for over 20 years – you couldn’t be in safer hands. Contact us now to book your free consultation with an expert of our team.